The best place to start with any remodeling project is the budget. Not only will it have a big impact on the type of materials you select for your bathroom renovation, it will also help you set the boundaries of your design. Knowing what you can really afford to spend will make it a lot easier to decide what items you want to replace and where you need to get creative!
While it's easy to replace a light or faucet at a later date, you should have your contractor do the larger tasks at the same time. If you plan to replace the tub and install tile floor, it's best to do that all at once. You may save on labor charges if they can do a few tasks in one day instead of doing these tasks on separate days a few months apart.
After the tearout, the plumbing and electrical are updated throughout the room to accommodate your new layout and fixtures. Then new backer board and subflooring 1 are put in, followed by tiling, and finally the installation of fixtures, lights, and accessories. From tearout to completion is usually a two to three week timeframe. Costs for this phase of the project range from $45-$65 for a plumber to $65-$85 an hour for an electrician and $5-$10 a square foot for flooring and tile preparation.
I have a new home plastic/fiberglass shower stall with a glass door and side panel. Two side are the plastic and it is probably 8' tall. I do not want to enlarge it at all. I want to just replace. It is like an inset that was there when we built the house. Not fancy. It is a white/cream color and I would just like something nicer to replace it. Anyone intrested in the Spring, Texas area.
You’ll spend $3,000 to $8,000 on the typical remodel. Anywhere from 40 to 65 percent of a bath upgrade cost comes from labor. However, doing any project yourself means no insurance and added fees if something goes wrong. Hire a professional for any work you’re not comfortable doing, such as the plumbing and electrical. Consider the pros and cons of DIY vs professional bathroom remodeling.
Often times, people confuse the difference between a master bathroom and a powder room. A master bathroom is a large bathroom that is attached to the master bedroom in a house. It is often big in size and contains a sink, toilet, shower, and bathtub. The bathtub and shower are either together or separate. A powder room is different in that it is a small bathroom only containing a toilet and a sink. Sometimes the name powder room is interchanged with guest bathroom or half baths. Powder rooms do not contain a shower, and is usually located on the first floor of a home. The purpose of a powder room is a bathroom for guests to use without feeling as if they are intruding into your home.
My bathroom is about 8X8. Received a quote for 17,000.00 just for labor only. Granted they would be gutting entire bathroom. Also plumbing fixtures will be in same place accept toilet moved 4"inches to the left. Air tub will replace current cast iron tub -no separate shower. My material cost will be about 9500.00 . They want half of the labor cost upfront ($8500.00 Demo will be done in one day and I must pay for dumpster. My home is worth about $200K This bathroom will cost a total of approximately $26K Is this a reasonable quote and I this too much overall to spend based on home resale?
There are a wide range of costs associated with remodeling a bathroom, including size, the type of materials, its current condition, and the location. Homeonwers spend on average between $15,000 and $25,000 in their bathroom renovation. For example, the average cost of a 100 square foot master bathroom with tile walls and flooring, new fixtures, double vanity, and walk in shower with separate tub is around $20,000.
×