A punitive approach to what could be unforseen and atypical delays may be a bad idea. I would suggest offering a bonus for the job being completed early rather than a penalty for it being delayed. If material is ordered, we can't make it arrive faster if something delays the shipment. We recently ordered a bathtub requested by a customer. It was promised by our supplier for a Wednesday delivery. Bad weather hit Texas and it just didn't leave the warehouse until the following Monday. It blew up our schedule for the project and it wasn't anyone's fault or mistake. If we have an employee critical to the project get sick or injured, we may not be able to get things done as originally scheduled. Jobs can get off schedule for a lot of reasons outside the contractor's control. Charging them for those things is likely to turn them away.
The cost to remodel a bathroom varies greatly. Factors like the current state of the space, the specific bathroom remodel design plans and material costs can all impact the overall price. Some bathroom remodel projects involve simple repairs and replacements in a small bathroom, whereas others require major replacements and upgrades, renovation of an entire bathroom or the addition of a whole new bathroom. So what will a bathroom remodeling contractor charge you? Let's look at the numbers.
You’ll spend $3,000 to $8,000 on the typical remodel. Anywhere from 40 to 65 percent of a bath upgrade cost comes from labor. However, doing any project yourself means no insurance and added fees if something goes wrong. Hire a professional for any work you’re not comfortable doing, such as the plumbing and electrical. Consider the pros and cons of DIY vs professional bathroom remodeling.
I acted as general contractor and did all my own demo to remodel my 6x8 bathroom. I hired subs individually to do most of the work - an electrician, a plumber, a drywall guy and a tile guy. I painted the walls and the ceiling. I replaced everything except the cast iron tub. Materials and fixtures cost around $2000 and labor was about $3000. My subs had no problem with me supplying the materials, because I discussed their job scope in advance. This project took 6 months but I did have another full bath to use in the mean time.

It's becoming increasingly popular to purchase custom items for the home, including the bathroom. While not everything can be made to order, custom cabinetry can help you make the most of the space. This type of work can typically cost significantly more than readymade and can take approximately 12 weeks to complete. Carpenters typically charge at least $70 an hour for built-ins 7, while can raise the cost of things like cabinetry to $2,000 per cabinet, with many bathrooms using a minimum of 3 or more.
I just renovated a 6X12 bathroom. Old cast iron tub removed. Removed and saved existing vanity and vanity top. Removed the toilet and replaced the existing rotten flooring and added on to the existing partially rotten floor joist. Removed the drywall and tile from around the old tub. After the new flooring was in I had to modify the existing plumbing to accommodate the new tub and shower surround. The hot and cold water lines had to be raised to fit the surround because the new tub is taller and the drains had to be installed and moved to fit the new tub. Drywall was finished and painted. New faucets,New tub,Tub Surround, and flooring materials were purchased by the home owner. Labor cost was 4,584.00
×