I just renovated a 6X12 bathroom. Old cast iron tub removed. Removed and saved existing vanity and vanity top. Removed the toilet and replaced the existing rotten flooring and added on to the existing partially rotten floor joist. Removed the drywall and tile from around the old tub. After the new flooring was in I had to modify the existing plumbing to accommodate the new tub and shower surround. The hot and cold water lines had to be raised to fit the surround because the new tub is taller and the drains had to be installed and moved to fit the new tub. Drywall was finished and painted. New faucets,New tub,Tub Surround, and flooring materials were purchased by the home owner. Labor cost was 4,584.00
It's totally legitimate for a professional to charge you for a design, at least in some situations. If the contractor has a book of ready-made designs and just pulled one out to show you, then you're right that s/he shouldn't charge you. But if someone does a design that conforms to your room's dimensions, with the features that you want, then that person has invested time in creating a work product. Some contractors and architects think that's just the cost of doing business, but many others consider that their time is worth something, and they charge for it. You just need to let contractors know that you're not looking for that kind of custom work, and not willing to pay for it.
With this article being close to 2 years old, I can easily say it is WAAAAYYYY out of date and couldn’t be farther from current outcomes. While some of the occurrences with the difficulty in getting responses from contractors might still be the same, the dollar figures are multiples off! My wife and I have been researching a modest renovation on our master bath (mid70’s colonial MB that was updated once before) and have reached out to multiple contractors over that timeframe. Each time, our revelation into the exhorbitant costs are proof enough we’re not asking either the right questions or the right contractors. The dissapointment in hearing the $30k minimum and 45$k midpoint (again...midpoint) for our studs to simple remodel are enough to send us into the nether-regions of misunderstanding and annoyance and the same time.
When you use a bold accessory like an animal skin, you need to make sure that it isn't lost in a bunch of other decor elements. This bathroom uses its neutral, modern design to really give space to the zebra skin rug here. And the great thing about this kind of design is that you can change this one decor element as often as you wish, without having to spend thousands remodeling every time.
Don't underestimate the importance of lighting in a bathroom. Sconce lighting at the vanity is the ideal way to get even lighting on your face, and installing it at eye level will help diminish unflattering shadows. Dim lighting is nice for a relaxing bath; bright lights are great for shaving or applying makeup. Adding more overall lighting can make a small bathroom seem larger.
There are a wide range of costs associated with remodeling a bathroom, including size, the type of materials, its current condition, and the location. Homeonwers spend on average between $15,000 and $25,000 in their bathroom renovation. For example, the average cost of a 100 square foot master bathroom with tile walls and flooring, new fixtures, double vanity, and walk in shower with separate tub is around $20,000.
Home Stratosphere is an award-winning home and garden online publication that’s a result of our talented researchers and writers who work directly with hundreds of professional interior designers, furniture designers, landscape designers and architects from around the world to create helpful, informative, entertaining and inspiring articles and design galleries.

It's so competitive out there. I am a Long Island contractor and I be realized lately that clients give you an impression when you give them there costs that you are doing something wrong. I've been in this Busines about 20 years and that avg cost is right there. Also homeowners should also realize if us contractors are using subs for our plumbing and electrical our costs are hire than the guy doing all the work himself. I only used licensed contractors for all my remodeling work.
×