The cost to remodel a bathroom varies greatly. Factors like the current state of the space, the specific bathroom remodel design plans and material costs can all impact the overall price. Some bathroom remodel projects involve simple repairs and replacements in a small bathroom, whereas others require major replacements and upgrades, renovation of an entire bathroom or the addition of a whole new bathroom. So what will a bathroom remodeling contractor charge you? Let's look at the numbers.
You want a company that has time for you and has long-term relationships with its subcontractors. Make sure you and your contractor have the same expectations about how often they will be onsite once the remodel or renovation kicks off. The contractor should be open with you about how long each stage of the project will take, and they should show a good understanding of what factors could potentially push that timeline out.
As the home owner, I am providing about $8,000 in materials. This includes the cabinetry, fixtures, faucets, countertops, lighting, toilet, glass in-line shower door and tile. Received two quotes. One contractor wants $25,000 to demo the bathroom, convert the existing tub to a tiled walk-in shower, tile the floor, and install my materials. The other wants $27,000. Using the previously mentioned 60/40 labor to material rate, I would be paying more than double for labor...that's insane. Some contractor's need a reality check.
My bathroom is about 8X8. Received a quote for 17,000.00 just for labor only. Granted they would be gutting entire bathroom. Also plumbing fixtures will be in same place accept toilet moved 4"inches to the left. Air tub will replace current cast iron tub -no separate shower. My material cost will be about 9500.00 . They want half of the labor cost upfront ($8500.00 Demo will be done in one day and I must pay for dumpster. My home is worth about $200K This bathroom will cost a total of approximately $26K Is this a reasonable quote and I this too much overall to spend based on home resale?
I can't even get anyone to look and give an estimate to complete a bathroom remodel- just the bathtub/shower part has to be done as the last person who was doing it died- the rest is complete and have all the items and materials already and paid for. once they hear that they are no longer intrested- what do they expect? me to let them rip out what was already done and repay and redone everything all over again so they get more money? and throw out brand new imported Travertine and Spanish tile?
I have a new home plastic/fiberglass shower stall with a glass door and side panel. Two side are the plastic and it is probably 8' tall. I do not want to enlarge it at all. I want to just replace. It is like an inset that was there when we built the house. Not fancy. It is a white/cream color and I would just like something nicer to replace it. Anyone intrested in the Spring, Texas area.
×