Going "green" is not only good for the environment; it’s also good for you. Green products have great design, tend to function better, which lowers utility bills, and they’re also chemical-free, making them better for your health. Having an eco-friendly approach to remodeling isn’t just about buying new products, doing something "green" can be as simple as painting a cabinet instead of tossing it in a landfill.
I just renovated a 6X12 bathroom. Old cast iron tub removed. Removed and saved existing vanity and vanity top. Removed the toilet and replaced the existing rotten flooring and added on to the existing partially rotten floor joist. Removed the drywall and tile from around the old tub. After the new flooring was in I had to modify the existing plumbing to accommodate the new tub and shower surround. The hot and cold water lines had to be raised to fit the surround because the new tub is taller and the drains had to be installed and moved to fit the new tub. Drywall was finished and painted. New faucets,New tub,Tub Surround, and flooring materials were purchased by the home owner. Labor cost was 4,584.00
While it's easy to replace a light or faucet at a later date, you should have your contractor do the larger tasks at the same time. If you plan to replace the tub and install tile floor, it's best to do that all at once. You may save on labor charges if they can do a few tasks in one day instead of doing these tasks on separate days a few months apart.
Be brutally honest about your DIY skill level. Assess which projects to do yourself and which are better left to the pros. You could save yourself a ton of money in the long run if you don’t have to call someone in to fix a project you’ve messed up. The best way to find a good contractor — seek referrals from friends, family, neighbors, co-workers and others who have had remodeling work done.
The average cost to gut and demolish a bathroom is $400 to $2,000. Prices depend on the room size, type of materials, which fixtures are being removed, if walls are being demolished, and if any damage is found in the subflooring or inner wall structure. You can DIY to save money, but hire a professional to inspect your electrical wiring and plumbing.
Unless specified in Project Options list, this typical bathroom remodel estimate does NOT include costs for relocating, repairing, modifying or enhancing existing structural, HVAC, electrical and plumbing systems. Estimate common structural and system modification costs with the Room Modifications Cost estimator or the Home Addition Cost estimator.

Going "green" is not only good for the environment; it’s also good for you. Green products have great design, tend to function better, which lowers utility bills, and they’re also chemical-free, making them better for your health. Having an eco-friendly approach to remodeling isn’t just about buying new products, doing something "green" can be as simple as painting a cabinet instead of tossing it in a landfill.
If someone was to come at us with their own additional contract, we would probably decide that we had given them enough of our time and move on. As Nick mentions below, the contractors reputation is the one on the line. They have every reason to do right by you. The crooks of the world generally don't have a reputation to stand on, and as a customer it is your job to research who you are hiring. If you can't find anything about them, they probably aren't who you want to be dealing with. If they ask for money upfront, they probably aren't running a stable outfit. We never take a penny upfront. We collect when the job is fully complete even when we are working on weeks long projects.
The more luxurious the materials for a bathroom remodeling project, the higher your budget will be. Using marble for your counters, custom cabinetry or handpainted ceramic tiles for your new shower walls in the master bathroom will look terrific. But it will also raise your material costs considerably more than installing a laminate countertop and low-end or mid-range tiles.
As a contractor I can tell you that most reputable contractors probably don't need your job, and if you make things too complicated or troublesome, they will move on to other jobs that don't throw up red flags. Much of what you ask for here is reasonable, but bringing a second contract into the equation can set of some alarms that you may be a difficult customer to work with or even a litigiously minded person who is likely to try and bring a lawsuit whether deserved or not. Anything you want covered should be in the original contract.

After the tearout, the plumbing and electrical are updated throughout the room to accommodate your new layout and fixtures. Then new backer board and subflooring 1 are put in, followed by tiling, and finally the installation of fixtures, lights, and accessories. From tearout to completion is usually a two to three week timeframe. Costs for this phase of the project range from $45-$65 for a plumber to $65-$85 an hour for an electrician and $5-$10 a square foot for flooring and tile preparation.
There are a wide range of costs associated with remodeling a bathroom, including size, the type of materials, its current condition, and the location. Homeonwers spend on average between $15,000 and $25,000 in their bathroom renovation. For example, the average cost of a 100 square foot master bathroom with tile walls and flooring, new fixtures, double vanity, and walk in shower with separate tub is around $20,000.
×