My suggestion is when talking to contractor be subtle and ask your questions. Ask if he/she will have a dumpster or trailer to haul away debris. If the don't get dumpster or have a trailer then you probably don't want them to work on your home. Tell them your concern with the only toilet in the house. Unless it is not safe I have always reinstalled the toilet so it could be used at night. A good contractor will work with you in anyway possible because you are the key to more business.
I agree with everything you said. I think the trick is to convey those concerns when discussing what work will be needed. Everyone will have concerns but if you come across as too needy or pushy they may think you will be a pain in the butt homeowner. I have seen this before where you have to come back 3 or 4 times for something not dealing with the work, but you are trying to be polite and helpful for business. Word of mouth is the best way to get more buisness, in my opinion.
As you might imagine, I once had to sue a contractor. He demanded payments up front during different stages of work replacing a roof and front porch on my house. When he wanted to cheap out and use inferior materials, i insisted he do the job to specifications I had provided to him in writing beforehand. He walked away from the job, half completed, and I had to hire someone else to finish it. I recovered most, but not all, of the money he had stolen.
The remodel is needed due to water leakage from the tub surround into the wall cavity. I recommended she get an estimate of extra costs that cannot be foreseen until demolition occurs but would be entailed if the contractor has to do any structural work like putting in new studs and or has to install new insulation. I urged her to get at least an upper ceiling estimate before work begins lest the contractor make her an offer she can't refuse once the room is gutted. I urged her to be flexible on any adjustment to the estimate that can be made only after demolition begins. But I told her to insist that the rest of the estimate be binding. No surprises.
It's so competitive out there. I am a Long Island contractor and I be realized lately that clients give you an impression when you give them there costs that you are doing something wrong. I've been in this Busines about 20 years and that avg cost is right there. Also homeowners should also realize if us contractors are using subs for our plumbing and electrical our costs are hire than the guy doing all the work himself. I only used licensed contractors for all my remodeling work.
Both Lowe’s and Home Depot offer bathroom remodeling services. Home Depot remodels cost $5,000 for a powder room up to $30,000 for a master bathroom remodel. Lowe’s suggests that customers expect to pay at least $100 per square foot on bathroom remodels. Both stores offer repairs on your existing fixtures and installing upgrades or new replacement parts.

As you might imagine, I once had to sue a contractor. He demanded payments up front during different stages of work replacing a roof and front porch on my house. When he wanted to cheap out and use inferior materials, i insisted he do the job to specifications I had provided to him in writing beforehand. He walked away from the job, half completed, and I had to hire someone else to finish it. I recovered most, but not all, of the money he had stolen.


As the home owner, I am providing about $8,000 in materials. This includes the cabinetry, fixtures, faucets, countertops, lighting, toilet, glass in-line shower door and tile. Received two quotes. One contractor wants $25,000 to demo the bathroom, convert the existing tub to a tiled walk-in shower, tile the floor, and install my materials. The other wants $27,000. Using the previously mentioned 60/40 labor to material rate, I would be paying more than double for labor...that's insane. Some contractor's need a reality check.
Want to save some big bucks remodeling your bathroom? Consider refinishing existing items such as your bathtub, shower, sink or tile. With refinishing, you’ll only pay a small fraction (as little as 10 percent) of the cost of replacement. Your bathroom won’t be torn up for weeks, you'll avoid the big renovation mess and you’ve put one less big ol’ tub in the landfill
I acted as general contractor and did all my own demo to remodel my 6x8 bathroom. I hired subs individually to do most of the work - an electrician, a plumber, a drywall guy and a tile guy. I painted the walls and the ceiling. I replaced everything except the cast iron tub. Materials and fixtures cost around $2000 and labor was about $3000. My subs had no problem with me supplying the materials, because I discussed their job scope in advance. This project took 6 months but I did have another full bath to use in the mean time.
×