A punitive approach to what could be unforseen and atypical delays may be a bad idea. I would suggest offering a bonus for the job being completed early rather than a penalty for it being delayed. If material is ordered, we can't make it arrive faster if something delays the shipment. We recently ordered a bathtub requested by a customer. It was promised by our supplier for a Wednesday delivery. Bad weather hit Texas and it just didn't leave the warehouse until the following Monday. It blew up our schedule for the project and it wasn't anyone's fault or mistake. If we have an employee critical to the project get sick or injured, we may not be able to get things done as originally scheduled. Jobs can get off schedule for a lot of reasons outside the contractor's control. Charging them for those things is likely to turn them away.

This estimate for a 2019 Typical Bathroom Remodel is derived from the unit cost method summarized in the American Institute of Architects Detailed Cost Estimating - Best Practices. This approach is used by professional designers, contractors, engineers and estimators and uses current wages, material costs, worker productivity benchmarks, supervisory overhead and markup rates.


Bathrooms traditionally have few to no natural lighting sources, so any lights that you include are important to the function of the room. Lighting helps not only with the use of the bathroom, but specific task lighting in the vanity and shower areas help enhance your experience there. Lighting for the bathroom can take several forms. The most common include:

I acted as general contractor and did all my own demo to remodel my 6x8 bathroom. I hired subs individually to do most of the work - an electrician, a plumber, a drywall guy and a tile guy. I painted the walls and the ceiling. I replaced everything except the cast iron tub. Materials and fixtures cost around $2000 and labor was about $3000. My subs had no problem with me supplying the materials, because I discussed their job scope in advance. This project took 6 months but I did have another full bath to use in the mean time.
×