Having an onsite dumpster should be your responsibility if it is something you are going to demand. They aren't cheap. Make suggestions or request a dumpster be included in the bid, but I would never start demanding anything when requesting proposals. They may have their own suggestions. We own a dump trailer and we bring it during demolition to handle the large debris. We have the trailer to avoid having to rent a dumpster on the job. If asked we can share this information, but if you require a dumpster instead we would have to take the time and research getting a dumpster to your house and add in costs we aren't accustomed to adding. That takes time and effort we may just not want to expend to give you a quote. Good contractors are generally very busy.
There are so many beautiful things to notice about this bathroom that it's hard to know where to start. The concrete sink? The wallpaper? The sconce lighting? The tarnished mirror on the door, reflected in the main mirror? The barely-there ultra-modern faucets? Whatever you notice first, though, you can't but admit that this space is a masterpiece.
A typical bathroom remodel costs $5,000 to $15,000, with most homeowners spending $120 to $275 per square foot. A typical 5x7 bathroom remodel costs $4,200 to $9,600. Small renovations cost $2,000 to $5,000 and one-day bath or shower remodels from Rebath or Bath Planet run $4,000 to $10,000. Get free estimates from bathroom remodelers near you or view our cost guide below.

The angles where any two planes meet in a wet area, such as the shower, tub, and countertop need to be filled with a flexible material to absorb movement and seal up this section to keep it watertight. This is usually done with some form of caulkĀ 6, either latex or silicone. A tube of caulkĀ 6 costs around $20 and this is usually installed with the tile, shower, or counter with the cost included in the tiling.
I can't even get anyone to look and give an estimate to complete a bathroom remodel- just the bathtub/shower part has to be done as the last person who was doing it died- the rest is complete and have all the items and materials already and paid for. once they hear that they are no longer intrested- what do they expect? me to let them rip out what was already done and repay and redone everything all over again so they get more money? and throw out brand new imported Travertine and Spanish tile?
As you might imagine, I once had to sue a contractor. He demanded payments up front during different stages of work replacing a roof and front porch on my house. When he wanted to cheap out and use inferior materials, i insisted he do the job to specifications I had provided to him in writing beforehand. He walked away from the job, half completed, and I had to hire someone else to finish it. I recovered most, but not all, of the money he had stolen.
I can't even get anyone to look and give an estimate to complete a bathroom remodel- just the bathtub/shower part has to be done as the last person who was doing it died- the rest is complete and have all the items and materials already and paid for. once they hear that they are no longer intrested- what do they expect? me to let them rip out what was already done and repay and redone everything all over again so they get more money? and throw out brand new imported Travertine and Spanish tile?
I just renovated a 6X12 bathroom. Old cast iron tub removed. Removed and saved existing vanity and vanity top. Removed the toilet and replaced the existing rotten flooring and added on to the existing partially rotten floor joist. Removed the drywall and tile from around the old tub. After the new flooring was in I had to modify the existing plumbing to accommodate the new tub and shower surround. The hot and cold water lines had to be raised to fit the surround because the new tub is taller and the drains had to be installed and moved to fit the new tub. Drywall was finished and painted. New faucets,New tub,Tub Surround, and flooring materials were purchased by the home owner. Labor cost was 4,584.00
×