Wall and Floor Tile: Ceramic, porcelain and natural stone are popular picks for floor tile in bathrooms. Materials will be the deciding factor here, but natural stone often costs more to install because it is difficult to cut and place. From natural stone and classic ceramic to glass and mosaic styles that mimic natural materials, wall tile options vary.


My suggestion is when talking to contractor be subtle and ask your questions. Ask if he/she will have a dumpster or trailer to haul away debris. If the don't get dumpster or have a trailer then you probably don't want them to work on your home. Tell them your concern with the only toilet in the house. Unless it is not safe I have always reinstalled the toilet so it could be used at night. A good contractor will work with you in anyway possible because you are the key to more business.
If someone was to come at us with their own additional contract, we would probably decide that we had given them enough of our time and move on. As Nick mentions below, the contractors reputation is the one on the line. They have every reason to do right by you. The crooks of the world generally don't have a reputation to stand on, and as a customer it is your job to research who you are hiring. If you can't find anything about them, they probably aren't who you want to be dealing with. If they ask for money upfront, they probably aren't running a stable outfit. We never take a penny upfront. We collect when the job is fully complete even when we are working on weeks long projects.

It's totally legitimate for a professional to charge you for a design, at least in some situations. If the contractor has a book of ready-made designs and just pulled one out to show you, then you're right that s/he shouldn't charge you. But if someone does a design that conforms to your room's dimensions, with the features that you want, then that person has invested time in creating a work product. Some contractors and architects think that's just the cost of doing business, but many others consider that their time is worth something, and they charge for it. You just need to let contractors know that you're not looking for that kind of custom work, and not willing to pay for it.
Top that with contractors that don’t even provide a drawings, plans or official documentation of their intent and we can see where their seemingly in control of the market. Their swagger is even more overloaded when they’re excited to come view your home yet can’t call you back week after week months later because they’re too busy to even consider your meager $30-50k one-room remodel.

Bathrooms traditionally have few to no natural lighting sources, so any lights that you include are important to the function of the room. Lighting helps not only with the use of the bathroom, but specific task lighting in the vanity and shower areas help enhance your experience there. Lighting for the bathroom can take several forms. The most common include:

With this article being close to 2 years old, I can easily say it is WAAAAYYYY out of date and couldn’t be farther from current outcomes. While some of the occurrences with the difficulty in getting responses from contractors might still be the same, the dollar figures are multiples off! My wife and I have been researching a modest renovation on our master bath (mid70’s colonial MB that was updated once before) and have reached out to multiple contractors over that timeframe. Each time, our revelation into the exhorbitant costs are proof enough we’re not asking either the right questions or the right contractors. The dissapointment in hearing the $30k minimum and 45$k midpoint (again...midpoint) for our studs to simple remodel are enough to send us into the nether-regions of misunderstanding and annoyance and the same time.
Don’t want your budget to skyrocket? Don't move your plumbing. On the surface, switching your sink and toilet around may look easy enough, but the problem lies underneath and all the costs involved in moving that plumbing. Besides, if you spend less money on moving fixtures, you’ll have more to spend on that new sleek shower system or vanity you’ve been eyeing.
The remodel is needed due to water leakage from the tub surround into the wall cavity. I recommended she get an estimate of extra costs that cannot be foreseen until demolition occurs but would be entailed if the contractor has to do any structural work like putting in new studs and or has to install new insulation. I urged her to get at least an upper ceiling estimate before work begins lest the contractor make her an offer she can't refuse once the room is gutted. I urged her to be flexible on any adjustment to the estimate that can be made only after demolition begins. But I told her to insist that the rest of the estimate be binding. No surprises.

I have a new home plastic/fiberglass shower stall with a glass door and side panel. Two side are the plastic and it is probably 8' tall. I do not want to enlarge it at all. I want to just replace. It is like an inset that was there when we built the house. Not fancy. It is a white/cream color and I would just like something nicer to replace it. Anyone intrested in the Spring, Texas area.
New to this site. My first thought is to the "DIY throw a bathroom together in a weekend" comment makers. Your comments about how much it cost you 2,000 to do a bathroom in your home correctly or incorrectly without a picture of the finished product is invalid in this forum. I had a customer spend 2k on a complete vanity, dumb comment. Second, I've agreed to the home owner supplying all the materials (one time mistake) and it was a total disaster after getting into the project. We know what we need when we go for supplies....plain and simple. A homeowner that purchases materials for a remodel they CAN'T handle for a contractor that CAN complete the task is like a mechanic ordering a transmission for a rear brake job....irresponsible. A good contractor listens to his customers, is given a budget, and decides if it is profitable for his company. If we give you a $7,000 price for a bathroom and you think it should be done for $5,000, I encourage the customer to get 2 more bids. I have faith in the quality of work I do, and if the customer doesn't see that from the very beginning, the transaction will be a nightmare. "JOE" your comment stuck out because its the unseen labor hours of modifying the old to fit the new that customers don't and will not ever understand. If you want something done right in your beautiful home, have the money set aside and then hire a contractor you trust to make your happy.

Remodeling your bathroom might seem like a complex task, but proper planning can help you get the look and feel you want for your home. Use this guide to learn more about the benefits of remodeling your powder room, guest bathroom or master bathroom space. Typically, bathroom remodels start at $5,000 and can vary based on the size of your room and the products you choose to update.
However, if you plan to add more square footage to your bathroom, that's where the expenses can really add up. Expanding the size of an existing small bathroom increases the total cost of a bathroom renovation project and lengthens the job's timeline. Some expansions may require permits, too, which may cost an additional fee and take time to secure.
Bathroom remodels provide 60 to 70 percent resale returns as a home improvement project. However, this project isn’t cheap. It is essential to plan your remodeling ideas ahead of time. Then, hire a remodeling contractor for the job. Ask questions, set realistic expectations, get accurate cost estimates and budgeting from the start. Also spend time learning how to work with a bathroom contractor.

I just renovated a 6X12 bathroom. Old cast iron tub removed. Removed and saved existing vanity and vanity top. Removed the toilet and replaced the existing rotten flooring and added on to the existing partially rotten floor joist. Removed the drywall and tile from around the old tub. After the new flooring was in I had to modify the existing plumbing to accommodate the new tub and shower surround. The hot and cold water lines had to be raised to fit the surround because the new tub is taller and the drains had to be installed and moved to fit the new tub. Drywall was finished and painted. New faucets,New tub,Tub Surround, and flooring materials were purchased by the home owner. Labor cost was 4,584.00

×