We’ve had a number of contractors to our house for a number of items from roof tear off & redo, to gutters and corner boards, whole-house carpet replacement and a basement completion. We know the lingo and the big picture but - whether it’s the timing or the unknown - this has been the most frustrating process ever! If you find a nuts & bolts, studs to baseboards and crown-molding to carpet contractor you can trust, consider yourself one of the lucky 10 across the country. The rest of us are stuck in the wild-west and unfortunately left with an article that’s not even worth updating over the past 2+ years.
I acted as general contractor and did all my own demo to remodel my 6x8 bathroom. I hired subs individually to do most of the work - an electrician, a plumber, a drywall guy and a tile guy. I painted the walls and the ceiling. I replaced everything except the cast iron tub. Materials and fixtures cost around $2000 and labor was about $3000. My subs had no problem with me supplying the materials, because I discussed their job scope in advance. This project took 6 months but I did have another full bath to use in the mean time.
As the home owner, I am providing about $8,000 in materials. This includes the cabinetry, fixtures, faucets, countertops, lighting, toilet, glass in-line shower door and tile. Received two quotes. One contractor wants $25,000 to demo the bathroom, convert the existing tub to a tiled walk-in shower, tile the floor, and install my materials. The other wants $27,000. Using the previously mentioned 60/40 labor to material rate, I would be paying more than double for labor...that's insane. Some contractor's need a reality check.
A punitive approach to what could be unforseen and atypical delays may be a bad idea. I would suggest offering a bonus for the job being completed early rather than a penalty for it being delayed. If material is ordered, we can't make it arrive faster if something delays the shipment. We recently ordered a bathtub requested by a customer. It was promised by our supplier for a Wednesday delivery. Bad weather hit Texas and it just didn't leave the warehouse until the following Monday. It blew up our schedule for the project and it wasn't anyone's fault or mistake. If we have an employee critical to the project get sick or injured, we may not be able to get things done as originally scheduled. Jobs can get off schedule for a lot of reasons outside the contractor's control. Charging them for those things is likely to turn them away.
What time does the work day start and end? Do workers clean up at the end of every day? Will they haul off garbage and debris? If pros are working inside, ask how they'll protect your hardwood floors from damage. It's best to talk about all of this upfront and get it in writing. And don't just take their word for it — make sure to read their previous reviews carefully to see what other homeowners have said about their working style.
Using the ultra-trendy animal skull as a main focus point, this space definitely stands out from the rest of the usual white and boring contemporary bathrooms. Notice how the tiny, delicate bare branch echoes and contrasts the strong antlers on the wall, and how the pendant light hangs right in the middle of the negative space provided by the antlers.
I acted as general contractor and did all my own demo to remodel my 6x8 bathroom. I hired subs individually to do most of the work - an electrician, a plumber, a drywall guy and a tile guy. I painted the walls and the ceiling. I replaced everything except the cast iron tub. Materials and fixtures cost around $2000 and labor was about $3000. My subs had no problem with me supplying the materials, because I discussed their job scope in advance. This project took 6 months but I did have another full bath to use in the mean time.
Bathrooms traditionally have few to no natural lighting sources, so any lights that you include are important to the function of the room. Lighting helps not only with the use of the bathroom, but specific task lighting in the vanity and shower areas help enhance your experience there. Lighting for the bathroom can take several forms. The most common include:
A typical bathroom remodel costs $5,000 to $15,000, with most homeowners spending $120 to $275 per square foot. A typical 5x7 bathroom remodel costs $4,200 to $9,600. Small renovations cost $2,000 to $5,000 and one-day bath or shower remodels from Rebath or Bath Planet run $4,000 to $10,000. Get free estimates from bathroom remodelers near you or view our cost guide below.
Once your new materials have arrived, the tearout begins. This involves removing everything from your bathroom right down to the studs. At this point in time, if there are issues with water leaks or mold, they can be addressed. It is at this stage that hidden issues are usually uncovered. Keep in mind that issues can dramatically impact your costs, depending on what is found. For example, mold remediation starts at $500 and water damage can cost as much as $2,700.
My bathroom is about 8X8. Received a quote for 17,000.00 just for labor only. Granted they would be gutting entire bathroom. Also plumbing fixtures will be in same place accept toilet moved 4"inches to the left. Air tub will replace current cast iron tub -no separate shower. My material cost will be about 9500.00 . They want half of the labor cost upfront ($8500.00 Demo will be done in one day and I must pay for dumpster. My home is worth about $200K This bathroom will cost a total of approximately $26K Is this a reasonable quote and I this too much overall to spend based on home resale?
Don’t want your budget to skyrocket? Don't move your plumbing. On the surface, switching your sink and toilet around may look easy enough, but the problem lies underneath and all the costs involved in moving that plumbing. Besides, if you spend less money on moving fixtures, you’ll have more to spend on that new sleek shower system or vanity you’ve been eyeing.

The remodel is needed due to water leakage from the tub surround into the wall cavity. I recommended she get an estimate of extra costs that cannot be foreseen until demolition occurs but would be entailed if the contractor has to do any structural work like putting in new studs and or has to install new insulation. I urged her to get at least an upper ceiling estimate before work begins lest the contractor make her an offer she can't refuse once the room is gutted. I urged her to be flexible on any adjustment to the estimate that can be made only after demolition begins. But I told her to insist that the rest of the estimate be binding. No surprises.
Wall and Floor Tile: Ceramic, porcelain and natural stone are popular picks for floor tile in bathrooms. Materials will be the deciding factor here, but natural stone often costs more to install because it is difficult to cut and place. From natural stone and classic ceramic to glass and mosaic styles that mimic natural materials, wall tile options vary.
Don’t want your budget to skyrocket? Don't move your plumbing. On the surface, switching your sink and toilet around may look easy enough, but the problem lies underneath and all the costs involved in moving that plumbing. Besides, if you spend less money on moving fixtures, you’ll have more to spend on that new sleek shower system or vanity you’ve been eyeing.
×