Home Stratosphere is an award-winning home and garden online publication that’s a result of our talented researchers and writers who work directly with hundreds of professional interior designers, furniture designers, landscape designers and architects from around the world to create helpful, informative, entertaining and inspiring articles and design galleries.
I acted as general contractor and did all my own demo to remodel my 6x8 bathroom. I hired subs individually to do most of the work - an electrician, a plumber, a drywall guy and a tile guy. I painted the walls and the ceiling. I replaced everything except the cast iron tub. Materials and fixtures cost around $2000 and labor was about $3000. My subs had no problem with me supplying the materials, because I discussed their job scope in advance. This project took 6 months but I did have another full bath to use in the mean time.
Bathrooms traditionally have few to no natural lighting sources, so any lights that you include are important to the function of the room. Lighting helps not only with the use of the bathroom, but specific task lighting in the vanity and shower areas help enhance your experience there. Lighting for the bathroom can take several forms. The most common include:
Using the ultra-trendy animal skull as a main focus point, this space definitely stands out from the rest of the usual white and boring contemporary bathrooms. Notice how the tiny, delicate bare branch echoes and contrasts the strong antlers on the wall, and how the pendant light hangs right in the middle of the negative space provided by the antlers.

I just renovated a 6X12 bathroom. Old cast iron tub removed. Removed and saved existing vanity and vanity top. Removed the toilet and replaced the existing rotten flooring and added on to the existing partially rotten floor joist. Removed the drywall and tile from around the old tub. After the new flooring was in I had to modify the existing plumbing to accommodate the new tub and shower surround. The hot and cold water lines had to be raised to fit the surround because the new tub is taller and the drains had to be installed and moved to fit the new tub. Drywall was finished and painted. New faucets,New tub,Tub Surround, and flooring materials were purchased by the home owner. Labor cost was 4,584.00
×