Toilets are also integral to the bathroom. They come in three standard rough-in sizes, with 12-inches being standard and costing the least, and 10 or 14-inch roughs coming in fewer options. Toilets come in one or two piece options with round or elongated bowls. Toilets also come in two heights, a standard 15-inch and a taller, ADA approved 17-inch. Costs for toilets start at $100 and can go as high as $1,000 for some higher end designs.

After the tearout, the plumbing and electrical are updated throughout the room to accommodate your new layout and fixtures. Then new backer board and subflooring 1 are put in, followed by tiling, and finally the installation of fixtures, lights, and accessories. From tearout to completion is usually a two to three week timeframe. Costs for this phase of the project range from $45-$65 for a plumber to $65-$85 an hour for an electrician and $5-$10 a square foot for flooring and tile preparation.
To give you more of an idea of what you'll pay before a contractor gives you an estimate, here are several cost examples for remodels of different size bathrooms, provided by Thumbtack Pro Viewpoint NW, a bathroom remodeler in Vancouver, Washington. Keep in mind each job was specific to that house. The total cost of each project includes all material and labor costs:
Using the ultra-trendy animal skull as a main focus point, this space definitely stands out from the rest of the usual white and boring contemporary bathrooms. Notice how the tiny, delicate bare branch echoes and contrasts the strong antlers on the wall, and how the pendant light hangs right in the middle of the negative space provided by the antlers.
To give you more of an idea of what you'll pay before a contractor gives you an estimate, here are several cost examples for remodels of different size bathrooms, provided by Thumbtack Pro Viewpoint NW, a bathroom remodeler in Vancouver, Washington. Keep in mind each job was specific to that house. The total cost of each project includes all material and labor costs:
The more luxurious the materials for a bathroom remodeling project, the higher your budget will be. Using marble for your counters, custom cabinetry or handpainted ceramic tiles for your new shower walls in the master bathroom will look terrific. But it will also raise your material costs considerably more than installing a laminate countertop and low-end or mid-range tiles.
As a contractor I can tell you that most reputable contractors probably don't need your job, and if you make things too complicated or troublesome, they will move on to other jobs that don't throw up red flags. Much of what you ask for here is reasonable, but bringing a second contract into the equation can set of some alarms that you may be a difficult customer to work with or even a litigiously minded person who is likely to try and bring a lawsuit whether deserved or not. Anything you want covered should be in the original contract.
Top that with contractors that don’t even provide a drawings, plans or official documentation of their intent and we can see where their seemingly in control of the market. Their swagger is even more overloaded when they’re excited to come view your home yet can’t call you back week after week months later because they’re too busy to even consider your meager $30-50k one-room remodel.
I acted as general contractor and did all my own demo to remodel my 6x8 bathroom. I hired subs individually to do most of the work - an electrician, a plumber, a drywall guy and a tile guy. I painted the walls and the ceiling. I replaced everything except the cast iron tub. Materials and fixtures cost around $2000 and labor was about $3000. My subs had no problem with me supplying the materials, because I discussed their job scope in advance. This project took 6 months but I did have another full bath to use in the mean time.
There are a wide range of costs associated with remodeling a bathroom, including size, the type of materials, its current condition, and the location. Homeonwers spend on average between $15,000 and $25,000 in their bathroom renovation. For example, the average cost of a 100 square foot master bathroom with tile walls and flooring, new fixtures, double vanity, and walk in shower with separate tub is around $20,000.
My suggestion is when talking to contractor be subtle and ask your questions. Ask if he/she will have a dumpster or trailer to haul away debris. If the don't get dumpster or have a trailer then you probably don't want them to work on your home. Tell them your concern with the only toilet in the house. Unless it is not safe I have always reinstalled the toilet so it could be used at night. A good contractor will work with you in anyway possible because you are the key to more business.
×