My suggestion is when talking to contractor be subtle and ask your questions. Ask if he/she will have a dumpster or trailer to haul away debris. If the don't get dumpster or have a trailer then you probably don't want them to work on your home. Tell them your concern with the only toilet in the house. Unless it is not safe I have always reinstalled the toilet so it could be used at night. A good contractor will work with you in anyway possible because you are the key to more business.
I agree with everything you said. I think the trick is to convey those concerns when discussing what work will be needed. Everyone will have concerns but if you come across as too needy or pushy they may think you will be a pain in the butt homeowner. I have seen this before where you have to come back 3 or 4 times for something not dealing with the work, but you are trying to be polite and helpful for business. Word of mouth is the best way to get more buisness, in my opinion.
Remodeling your bathroom might seem like a complex task, but proper planning can help you get the look and feel you want for your home. Use this guide to learn more about the benefits of remodeling your powder room, guest bathroom or master bathroom space. Typically, bathroom remodels start at $5,000 and can vary based on the size of your room and the products you choose to update.
A punitive approach to what could be unforseen and atypical delays may be a bad idea. I would suggest offering a bonus for the job being completed early rather than a penalty for it being delayed. If material is ordered, we can't make it arrive faster if something delays the shipment. We recently ordered a bathtub requested by a customer. It was promised by our supplier for a Wednesday delivery. Bad weather hit Texas and it just didn't leave the warehouse until the following Monday. It blew up our schedule for the project and it wasn't anyone's fault or mistake. If we have an employee critical to the project get sick or injured, we may not be able to get things done as originally scheduled. Jobs can get off schedule for a lot of reasons outside the contractor's control. Charging them for those things is likely to turn them away. 

Often times, people confuse the difference between a master bathroom and a powder room. A master bathroom is a large bathroom that is attached to the master bedroom in a house. It is often big in size and contains a sink, toilet, shower, and bathtub. The bathtub and shower are either together or separate. A powder room is different in that it is a small bathroom only containing a toilet and a sink. Sometimes the name powder room is interchanged with guest bathroom or half baths. Powder rooms do not contain a shower, and is usually located on the first floor of a home. The purpose of a powder room is a bathroom for guests to use without feeling as if they are intruding into your home.
Having an onsite dumpster should be your responsibility if it is something you are going to demand. They aren't cheap. Make suggestions or request a dumpster be included in the bid, but I would never start demanding anything when requesting proposals. They may have their own suggestions. We own a dump trailer and we bring it during demolition to handle the large debris. We have the trailer to avoid having to rent a dumpster on the job. If asked we can share this information, but if you require a dumpster instead we would have to take the time and research getting a dumpster to your house and add in costs we aren't accustomed to adding. That takes time and effort we may just not want to expend to give you a quote. Good contractors are generally very busy.
As I contractor if I am installing a customers product or supplying my own, I am charging full overhead and profit above the install cost. I try not to allow customers to supply materials and when they do I tack on my overhead and profit in to the labor. Remodeling is one of the most time consuming services and if your not covering your overhead and profit in the materials and labor you will not last long in this business. At the end of the day after all said and done, making a 15% profit is respectable. Think about it, your the designer, the gofer, the physiatrist, the builder, shopper and the banker until you get paid. Never be intimidated to support your price, deliver a quality product and support it with proper pricing. Never let the customer supply there own materials. Movie theaters don't let you bring in your own pop corn, so why should contractors be any different.
The average bathroom remodel costs $10,446 Most homeowners spend between $5,977 and $14,926. You can spend as little as $3,500 to $7,000 updating the essentials in a small or medium-sized bathroom. On a large or master bath, you could spend $25,000 or more. Labor averages 50 percent of the total project price at about $65 per hour. Expect pricing to vary regionally up to 20 percent due mainly to labor. Material prices stay roughly the same across the country.
The remodel is needed due to water leakage from the tub surround into the wall cavity. I recommended she get an estimate of extra costs that cannot be foreseen until demolition occurs but would be entailed if the contractor has to do any structural work like putting in new studs and or has to install new insulation. I urged her to get at least an upper ceiling estimate before work begins lest the contractor make her an offer she can't refuse once the room is gutted. I urged her to be flexible on any adjustment to the estimate that can be made only after demolition begins. But I told her to insist that the rest of the estimate be binding. No surprises.

Be brutally honest about your DIY skill level. Assess which projects to do yourself and which are better left to the pros. You could save yourself a ton of money in the long run if you don’t have to call someone in to fix a project you’ve messed up. The best way to find a good contractor — seek referrals from friends, family, neighbors, co-workers and others who have had remodeling work done.


The angles where any two planes meet in a wet area, such as the shower, tub, and countertop need to be filled with a flexible material to absorb movement and seal up this section to keep it watertight. This is usually done with some form of caulk 6, either latex or silicone. A tube of caulk 6 costs around $20 and this is usually installed with the tile, shower, or counter with the cost included in the tiling.
The more luxurious the materials for a bathroom remodeling project, the higher your budget will be. Using marble for your counters, custom cabinetry or handpainted ceramic tiles for your new shower walls in the master bathroom will look terrific. But it will also raise your material costs considerably more than installing a laminate countertop and low-end or mid-range tiles.
A punitive approach to what could be unforseen and atypical delays may be a bad idea. I would suggest offering a bonus for the job being completed early rather than a penalty for it being delayed. If material is ordered, we can't make it arrive faster if something delays the shipment. We recently ordered a bathtub requested by a customer. It was promised by our supplier for a Wednesday delivery. Bad weather hit Texas and it just didn't leave the warehouse until the following Monday. It blew up our schedule for the project and it wasn't anyone's fault or mistake. If we have an employee critical to the project get sick or injured, we may not be able to get things done as originally scheduled. Jobs can get off schedule for a lot of reasons outside the contractor's control. Charging them for those things is likely to turn them away.
I have a new home plastic/fiberglass shower stall with a glass door and side panel. Two side are the plastic and it is probably 8' tall. I do not want to enlarge it at all. I want to just replace. It is like an inset that was there when we built the house. Not fancy. It is a white/cream color and I would just like something nicer to replace it. Anyone intrested in the Spring, Texas area.
×
bathroom remodel contractors lancaster pa bathroom remodel 10 x 8 | bathroom ideas with pictures small bathroom remodel ideas with tile

The things that may scare someone away is agreeing on cost and deadline before they could know what they are getting into. The last thing they want is for this job to cost them money. I think a good way to talk about deadline and reimbursement it to tell them your concerns. Be honest, tell them it is costing you time and money having to shower somewhere else. Ask them if it would be possible to be reimbursed if it goes over deadline. If they agree put it in contract. What I think the trick is, is to bring up the topic and let it be their idea or have them agree to an idea rather than coming to them with something seeming like demands. Offer a drink or something, seem friendly and easy to work with. Kindness goes a long way. Their reputation is on the line not yours.
As a contractor I can tell you that most reputable contractors probably don't need your job, and if you make things too complicated or troublesome, they will move on to other jobs that don't throw up red flags. Much of what you ask for here is reasonable, but bringing a second contract into the equation can set of some alarms that you may be a difficult customer to work with or even a litigiously minded person who is likely to try and bring a lawsuit whether deserved or not. Anything you want covered should be in the original contract.

This estimate for a 2019 Typical Bathroom Remodel is derived from the unit cost method summarized in the American Institute of Architects Detailed Cost Estimating - Best Practices. This approach is used by professional designers, contractors, engineers and estimators and uses current wages, material costs, worker productivity benchmarks, supervisory overhead and markup rates.
After the tearout, the plumbing and electrical are updated throughout the room to accommodate your new layout and fixtures. Then new backer board and subflooring 1 are put in, followed by tiling, and finally the installation of fixtures, lights, and accessories. From tearout to completion is usually a two to three week timeframe. Costs for this phase of the project range from $45-$65 for a plumber to $65-$85 an hour for an electrician and $5-$10 a square foot for flooring and tile preparation.
We own a kitchen and bath company. If you are going to do the work yourself, you will save money....if you act as the GC, that is great as long as you have the time to manage the project. If you are using a guy out of his truck, the job will be less expensive. BUT check their references and insurance. WE run a legitimate business and a showroom. We are not inexpensive but are not high priced. YOU MUST have realistic expectations of what things cost, both in material and labor costs. We pull permits also....all this costs money. We have 30 years in business. Do not expect a full demo of a bathroom to be $11,000 in CT. If someone gives you a price like that RUN, it is too good to be true. You are looking at 18,000 and up. Cheaper does not mean better. If you are buying all the materials at HD or Lowes, good luck. You will redo your space one more time before you move. Spend a little more on a good, experienced contractor now....in the end it will be worth it.

Ventilation. Ventilation. Ventilation. Moisture is your bathroom’s greatest enemy. Mold and mildew will make quick work of any renovation you’ve done so be sure to install a vent fan of appropriate CFMs for the square footage of your bathroom. The rough guide is one CFM per square foot for bathrooms of one hundred square feet or smaller. New designs are quieter and more stylish than ever and are a must have for any bathroom remodel.
If you’re suffering from sticker shock, don’t worry. Bathroom remodeling isn’t all or nothing. You can cut down on bathroom remodel costs by going one step at a time. A bathroom can still benefit from new lighting or ventilation updates followed by a new bathroom vanity or granite countertops. You can always upgrade some features later down the road.
After the tearout, the plumbing and electrical are updated throughout the room to accommodate your new layout and fixtures. Then new backer board and subflooring 1 are put in, followed by tiling, and finally the installation of fixtures, lights, and accessories. From tearout to completion is usually a two to three week timeframe. Costs for this phase of the project range from $45-$65 for a plumber to $65-$85 an hour for an electrician and $5-$10 a square foot for flooring and tile preparation.

What time does the work day start and end? Do workers clean up at the end of every day? Will they haul off garbage and debris? If pros are working inside, ask how they'll protect your hardwood floors from damage. It's best to talk about all of this upfront and get it in writing. And don't just take their word for it — make sure to read their previous reviews carefully to see what other homeowners have said about their working style.
This estimate for a 2019 Typical Bathroom Remodel is derived from the unit cost method summarized in the American Institute of Architects Detailed Cost Estimating - Best Practices. This approach is used by professional designers, contractors, engineers and estimators and uses current wages, material costs, worker productivity benchmarks, supervisory overhead and markup rates.

As you might imagine, I once had to sue a contractor. He demanded payments up front during different stages of work replacing a roof and front porch on my house. When he wanted to cheap out and use inferior materials, i insisted he do the job to specifications I had provided to him in writing beforehand. He walked away from the job, half completed, and I had to hire someone else to finish it. I recovered most, but not all, of the money he had stolen.
We own a kitchen and bath company. If you are going to do the work yourself, you will save money....if you act as the GC, that is great as long as you have the time to manage the project. If you are using a guy out of his truck, the job will be less expensive. BUT check their references and insurance. WE run a legitimate business and a showroom. We are not inexpensive but are not high priced. YOU MUST have realistic expectations of what things cost, both in material and labor costs. We pull permits also....all this costs money. We have 30 years in business. Do not expect a full demo of a bathroom to be $11,000 in CT. If someone gives you a price like that RUN, it is too good to be true. You are looking at 18,000 and up. Cheaper does not mean better. If you are buying all the materials at HD or Lowes, good luck. You will redo your space one more time before you move. Spend a little more on a good, experienced contractor now....in the end it will be worth it.

I can't even get anyone to look and give an estimate to complete a bathroom remodel- just the bathtub/shower part has to be done as the last person who was doing it died- the rest is complete and have all the items and materials already and paid for. once they hear that they are no longer intrested- what do they expect? me to let them rip out what was already done and repay and redone everything all over again so they get more money? and throw out brand new imported Travertine and Spanish tile?
One client may want vinyl flooring and another may want heated floors with custom tile. Do you want a custom shower the most costly or a tub with tile on the walls? Solid surface counters, high-end fixtures or big box quality. Small 5x7 bathrooms can cost almost as much as a larger bathroom. The time to properly build a watertight custom shower is the same regardless of how big a room is or how much your home is worth. Have it done right rather than choose the lowest cost contractor. A years from now when your shower is still working perfectly you will be glad you spent a little more and gave your contractor the time to do excellent work. VInce
Don't underestimate the importance of lighting in a bathroom. Sconce lighting at the vanity is the ideal way to get even lighting on your face, and installing it at eye level will help diminish unflattering shadows. Dim lighting is nice for a relaxing bath; bright lights are great for shaving or applying makeup. Adding more overall lighting can make a small bathroom seem larger.
Top that with contractors that don’t even provide a drawings, plans or official documentation of their intent and we can see where their seemingly in control of the market. Their swagger is even more overloaded when they’re excited to come view your home yet can’t call you back week after week months later because they’re too busy to even consider your meager $30-50k one-room remodel.

My bathroom is about 8X8. Received a quote for 17,000.00 just for labor only. Granted they would be gutting entire bathroom. Also plumbing fixtures will be in same place accept toilet moved 4"inches to the left. Air tub will replace current cast iron tub -no separate shower. My material cost will be about 9500.00 . They want half of the labor cost upfront ($8500.00 Demo will be done in one day and I must pay for dumpster. My home is worth about $200K This bathroom will cost a total of approximately $26K Is this a reasonable quote and I this too much overall to spend based on home resale?


As I contractor if I am installing a customers product or supplying my own, I am charging full overhead and profit above the install cost. I try not to allow customers to supply materials and when they do I tack on my overhead and profit in to the labor. Remodeling is one of the most time consuming services and if your not covering your overhead and profit in the materials and labor you will not last long in this business. At the end of the day after all said and done, making a 15% profit is respectable. Think about it, your the designer, the gofer, the physiatrist, the builder, shopper and the banker until you get paid. Never be intimidated to support your price, deliver a quality product and support it with proper pricing. Never let the customer supply there own materials. Movie theaters don't let you bring in your own pop corn, so why should contractors be any different.

I just renovated a 6X12 bathroom. Old cast iron tub removed. Removed and saved existing vanity and vanity top. Removed the toilet and replaced the existing rotten flooring and added on to the existing partially rotten floor joist. Removed the drywall and tile from around the old tub. After the new flooring was in I had to modify the existing plumbing to accommodate the new tub and shower surround. The hot and cold water lines had to be raised to fit the surround because the new tub is taller and the drains had to be installed and moved to fit the new tub. Drywall was finished and painted. New faucets,New tub,Tub Surround, and flooring materials were purchased by the home owner. Labor cost was 4,584.00
×