My suggestion is when talking to contractor be subtle and ask your questions. Ask if he/she will have a dumpster or trailer to haul away debris. If the don't get dumpster or have a trailer then you probably don't want them to work on your home. Tell them your concern with the only toilet in the house. Unless it is not safe I have always reinstalled the toilet so it could be used at night. A good contractor will work with you in anyway possible because you are the key to more business.
I agree with everything you said. I think the trick is to convey those concerns when discussing what work will be needed. Everyone will have concerns but if you come across as too needy or pushy they may think you will be a pain in the butt homeowner. I have seen this before where you have to come back 3 or 4 times for something not dealing with the work, but you are trying to be polite and helpful for business. Word of mouth is the best way to get more buisness, in my opinion.
Remodeling your bathroom might seem like a complex task, but proper planning can help you get the look and feel you want for your home. Use this guide to learn more about the benefits of remodeling your powder room, guest bathroom or master bathroom space. Typically, bathroom remodels start at $5,000 and can vary based on the size of your room and the products you choose to update.
A punitive approach to what could be unforseen and atypical delays may be a bad idea. I would suggest offering a bonus for the job being completed early rather than a penalty for it being delayed. If material is ordered, we can't make it arrive faster if something delays the shipment. We recently ordered a bathtub requested by a customer. It was promised by our supplier for a Wednesday delivery. Bad weather hit Texas and it just didn't leave the warehouse until the following Monday. It blew up our schedule for the project and it wasn't anyone's fault or mistake. If we have an employee critical to the project get sick or injured, we may not be able to get things done as originally scheduled. Jobs can get off schedule for a lot of reasons outside the contractor's control. Charging them for those things is likely to turn them away. 

Often times, people confuse the difference between a master bathroom and a powder room. A master bathroom is a large bathroom that is attached to the master bedroom in a house. It is often big in size and contains a sink, toilet, shower, and bathtub. The bathtub and shower are either together or separate. A powder room is different in that it is a small bathroom only containing a toilet and a sink. Sometimes the name powder room is interchanged with guest bathroom or half baths. Powder rooms do not contain a shower, and is usually located on the first floor of a home. The purpose of a powder room is a bathroom for guests to use without feeling as if they are intruding into your home.
Having an onsite dumpster should be your responsibility if it is something you are going to demand. They aren't cheap. Make suggestions or request a dumpster be included in the bid, but I would never start demanding anything when requesting proposals. They may have their own suggestions. We own a dump trailer and we bring it during demolition to handle the large debris. We have the trailer to avoid having to rent a dumpster on the job. If asked we can share this information, but if you require a dumpster instead we would have to take the time and research getting a dumpster to your house and add in costs we aren't accustomed to adding. That takes time and effort we may just not want to expend to give you a quote. Good contractors are generally very busy.
As I contractor if I am installing a customers product or supplying my own, I am charging full overhead and profit above the install cost. I try not to allow customers to supply materials and when they do I tack on my overhead and profit in to the labor. Remodeling is one of the most time consuming services and if your not covering your overhead and profit in the materials and labor you will not last long in this business. At the end of the day after all said and done, making a 15% profit is respectable. Think about it, your the designer, the gofer, the physiatrist, the builder, shopper and the banker until you get paid. Never be intimidated to support your price, deliver a quality product and support it with proper pricing. Never let the customer supply there own materials. Movie theaters don't let you bring in your own pop corn, so why should contractors be any different.
The average bathroom remodel costs $10,446 Most homeowners spend between $5,977 and $14,926. You can spend as little as $3,500 to $7,000 updating the essentials in a small or medium-sized bathroom. On a large or master bath, you could spend $25,000 or more. Labor averages 50 percent of the total project price at about $65 per hour. Expect pricing to vary regionally up to 20 percent due mainly to labor. Material prices stay roughly the same across the country.
The remodel is needed due to water leakage from the tub surround into the wall cavity. I recommended she get an estimate of extra costs that cannot be foreseen until demolition occurs but would be entailed if the contractor has to do any structural work like putting in new studs and or has to install new insulation. I urged her to get at least an upper ceiling estimate before work begins lest the contractor make her an offer she can't refuse once the room is gutted. I urged her to be flexible on any adjustment to the estimate that can be made only after demolition begins. But I told her to insist that the rest of the estimate be binding. No surprises.

Be brutally honest about your DIY skill level. Assess which projects to do yourself and which are better left to the pros. You could save yourself a ton of money in the long run if you don’t have to call someone in to fix a project you’ve messed up. The best way to find a good contractor — seek referrals from friends, family, neighbors, co-workers and others who have had remodeling work done.


The angles where any two planes meet in a wet area, such as the shower, tub, and countertop need to be filled with a flexible material to absorb movement and seal up this section to keep it watertight. This is usually done with some form of caulk 6, either latex or silicone. A tube of caulk 6 costs around $20 and this is usually installed with the tile, shower, or counter with the cost included in the tiling.
The more luxurious the materials for a bathroom remodeling project, the higher your budget will be. Using marble for your counters, custom cabinetry or handpainted ceramic tiles for your new shower walls in the master bathroom will look terrific. But it will also raise your material costs considerably more than installing a laminate countertop and low-end or mid-range tiles.
A punitive approach to what could be unforseen and atypical delays may be a bad idea. I would suggest offering a bonus for the job being completed early rather than a penalty for it being delayed. If material is ordered, we can't make it arrive faster if something delays the shipment. We recently ordered a bathtub requested by a customer. It was promised by our supplier for a Wednesday delivery. Bad weather hit Texas and it just didn't leave the warehouse until the following Monday. It blew up our schedule for the project and it wasn't anyone's fault or mistake. If we have an employee critical to the project get sick or injured, we may not be able to get things done as originally scheduled. Jobs can get off schedule for a lot of reasons outside the contractor's control. Charging them for those things is likely to turn them away.
I have a new home plastic/fiberglass shower stall with a glass door and side panel. Two side are the plastic and it is probably 8' tall. I do not want to enlarge it at all. I want to just replace. It is like an inset that was there when we built the house. Not fancy. It is a white/cream color and I would just like something nicer to replace it. Anyone intrested in the Spring, Texas area.
×
bathroom remodel ideas lowes bathroom remodeling san diego | bathroom remodel showrooms denver full bathroom remodel near me

New to this site. My first thought is to the "DIY throw a bathroom together in a weekend" comment makers. Your comments about how much it cost you 2,000 to do a bathroom in your home correctly or incorrectly without a picture of the finished product is invalid in this forum. I had a customer spend 2k on a complete vanity, dumb comment. Second, I've agreed to the home owner supplying all the materials (one time mistake) and it was a total disaster after getting into the project. We know what we need when we go for supplies....plain and simple. A homeowner that purchases materials for a remodel they CAN'T handle for a contractor that CAN complete the task is like a mechanic ordering a transmission for a rear brake job....irresponsible. A good contractor listens to his customers, is given a budget, and decides if it is profitable for his company. If we give you a $7,000 price for a bathroom and you think it should be done for $5,000, I encourage the customer to get 2 more bids. I have faith in the quality of work I do, and if the customer doesn't see that from the very beginning, the transaction will be a nightmare. "JOE" your comment stuck out because its the unseen labor hours of modifying the old to fit the new that customers don't and will not ever understand. If you want something done right in your beautiful home, have the money set aside and then hire a contractor you trust to make your happy.
My bathroom is about 8X8. Received a quote for 17,000.00 just for labor only. Granted they would be gutting entire bathroom. Also plumbing fixtures will be in same place accept toilet moved 4"inches to the left. Air tub will replace current cast iron tub -no separate shower. My material cost will be about 9500.00 . They want half of the labor cost upfront ($8500.00 Demo will be done in one day and I must pay for dumpster. My home is worth about $200K This bathroom will cost a total of approximately $26K Is this a reasonable quote and I this too much overall to spend based on home resale?
We’ve had a number of contractors to our house for a number of items from roof tear off & redo, to gutters and corner boards, whole-house carpet replacement and a basement completion. We know the lingo and the big picture but - whether it’s the timing or the unknown - this has been the most frustrating process ever! If you find a nuts & bolts, studs to baseboards and crown-molding to carpet contractor you can trust, consider yourself one of the lucky 10 across the country. The rest of us are stuck in the wild-west and unfortunately left with an article that’s not even worth updating over the past 2+ years.
What time does the work day start and end? Do workers clean up at the end of every day? Will they haul off garbage and debris? If pros are working inside, ask how they'll protect your hardwood floors from damage. It's best to talk about all of this upfront and get it in writing. And don't just take their word for it — make sure to read their previous reviews carefully to see what other homeowners have said about their working style.
It's totally legitimate for a professional to charge you for a design, at least in some situations. If the contractor has a book of ready-made designs and just pulled one out to show you, then you're right that s/he shouldn't charge you. But if someone does a design that conforms to your room's dimensions, with the features that you want, then that person has invested time in creating a work product. Some contractors and architects think that's just the cost of doing business, but many others consider that their time is worth something, and they charge for it. You just need to let contractors know that you're not looking for that kind of custom work, and not willing to pay for it.
While it's easy to replace a light or faucet at a later date, you should have your contractor do the larger tasks at the same time. If you plan to replace the tub and install tile floor, it's best to do that all at once. You may save on labor charges if they can do a few tasks in one day instead of doing these tasks on separate days a few months apart.
Going "green" is not only good for the environment; it’s also good for you. Green products have great design, tend to function better, which lowers utility bills, and they’re also chemical-free, making them better for your health. Having an eco-friendly approach to remodeling isn’t just about buying new products, doing something "green" can be as simple as painting a cabinet instead of tossing it in a landfill.
The remodel is needed due to water leakage from the tub surround into the wall cavity. I recommended she get an estimate of extra costs that cannot be foreseen until demolition occurs but would be entailed if the contractor has to do any structural work like putting in new studs and or has to install new insulation. I urged her to get at least an upper ceiling estimate before work begins lest the contractor make her an offer she can't refuse once the room is gutted. I urged her to be flexible on any adjustment to the estimate that can be made only after demolition begins. But I told her to insist that the rest of the estimate be binding. No surprises.
And then the apples to bananas procedure of reviewing non-like proposals is just as frustrating. Some bring everything. From the paint to the tile to the fixtures and cabinetry. Others point you in you’re own direction for each of these and expect you to know what questions to ask when buying never-before, behind the scenes purchases that are required for a bathroom remodel. And you’re expected to review the costs a la carte vs as a package and come to a whole conclusion as soon as possible ‘cause if you want the remodel done in 5 months, we have to start in 3 and we’re booked for the next 6...wait, what??!?!?
I can't even get anyone to look and give an estimate to complete a bathroom remodel- just the bathtub/shower part has to be done as the last person who was doing it died- the rest is complete and have all the items and materials already and paid for. once they hear that they are no longer intrested- what do they expect? me to let them rip out what was already done and repay and redone everything all over again so they get more money? and throw out brand new imported Travertine and Spanish tile?

I can't even get anyone to look and give an estimate to complete a bathroom remodel- just the bathtub/shower part has to be done as the last person who was doing it died- the rest is complete and have all the items and materials already and paid for. once they hear that they are no longer intrested- what do they expect? me to let them rip out what was already done and repay and redone everything all over again so they get more money? and throw out brand new imported Travertine and Spanish tile?
I have been trying to find an honest contractor to do 1) tar roof vent pipes on a good roof 2) remodel my small 6'x8' bathroom. I was so shocked at what these 'devil people' came up with. The roof guy said he wants $1100 to repair some caulking around vent pipes and fix 6 nails that popped. I told him to try somewhere else and bough my own 24 foot ladder!! The bathroom contractors were worse. I had 3 estimates - first guy wanted already $500 just to come up with a design and it was NOT REFUNDABLE if we did not go with him. I showed him the door. THe next guy asked us to come to his showroom and he was not prepared at all. He did not know how to use the computer to show us details of his/our ideas, but came with a breakdown of items in the bathroom we could buy. He then came ups with a price of $25000!! After doing research, I see such a small bathroom with simple tile and small vanity, new toilet and replace already standing shower with tile and glass door cost max. $18000 in southern California where people earn double in Virginia. This $18000 makeover was absolutely gorgeous and in a huge bathroom with tub, shower and dressing room!! The third contractor came up with the price of $17,000. This was still way over what it should cost because the bathroom is SO SMALL that two people can not fit in there. What is happening to this USA? Because of the crisis back in 2008/2009, these contractors have all become ripoff artists and make the world what it is today.....how about honesty and kindness. This behavior is a vicious circle and will come back to all one day. Beware.
What time does the work day start and end? Do workers clean up at the end of every day? Will they haul off garbage and debris? If pros are working inside, ask how they'll protect your hardwood floors from damage. It's best to talk about all of this upfront and get it in writing. And don't just take their word for it — make sure to read their previous reviews carefully to see what other homeowners have said about their working style.
Top that with contractors that don’t even provide a drawings, plans or official documentation of their intent and we can see where their seemingly in control of the market. Their swagger is even more overloaded when they’re excited to come view your home yet can’t call you back week after week months later because they’re too busy to even consider your meager $30-50k one-room remodel.
You’ll spend $3,000 to $8,000 on the typical remodel. Anywhere from 40 to 65 percent of a bath upgrade cost comes from labor. However, doing any project yourself means no insurance and added fees if something goes wrong. Hire a professional for any work you’re not comfortable doing, such as the plumbing and electrical. Consider the pros and cons of DIY vs professional bathroom remodeling.
My bathroom is about 8X8. Received a quote for 17,000.00 just for labor only. Granted they would be gutting entire bathroom. Also plumbing fixtures will be in same place accept toilet moved 4"inches to the left. Air tub will replace current cast iron tub -no separate shower. My material cost will be about 9500.00 . They want half of the labor cost upfront ($8500.00 Demo will be done in one day and I must pay for dumpster. My home is worth about $200K This bathroom will cost a total of approximately $26K Is this a reasonable quote and I this too much overall to spend based on home resale?
And then the apples to bananas procedure of reviewing non-like proposals is just as frustrating. Some bring everything. From the paint to the tile to the fixtures and cabinetry. Others point you in you’re own direction for each of these and expect you to know what questions to ask when buying never-before, behind the scenes purchases that are required for a bathroom remodel. And you’re expected to review the costs a la carte vs as a package and come to a whole conclusion as soon as possible ‘cause if you want the remodel done in 5 months, we have to start in 3 and we’re booked for the next 6...wait, what??!?!?
Bathrooms traditionally have few to no natural lighting sources, so any lights that you include are important to the function of the room. Lighting helps not only with the use of the bathroom, but specific task lighting in the vanity and shower areas help enhance your experience there. Lighting for the bathroom can take several forms. The most common include:

A punitive approach to what could be unforseen and atypical delays may be a bad idea. I would suggest offering a bonus for the job being completed early rather than a penalty for it being delayed. If material is ordered, we can't make it arrive faster if something delays the shipment. We recently ordered a bathtub requested by a customer. It was promised by our supplier for a Wednesday delivery. Bad weather hit Texas and it just didn't leave the warehouse until the following Monday. It blew up our schedule for the project and it wasn't anyone's fault or mistake. If we have an employee critical to the project get sick or injured, we may not be able to get things done as originally scheduled. Jobs can get off schedule for a lot of reasons outside the contractor's control. Charging them for those things is likely to turn them away.


I agree with everything you said. I think the trick is to convey those concerns when discussing what work will be needed. Everyone will have concerns but if you come across as too needy or pushy they may think you will be a pain in the butt homeowner. I have seen this before where you have to come back 3 or 4 times for something not dealing with the work, but you are trying to be polite and helpful for business. Word of mouth is the best way to get more buisness, in my opinion.
Everyone wants to save money, but when you start by questioning material costs or markups it can indicate that you may be under budgeting for the project, or will question every choice the contractor makes in the hopes of saving $100. Time is money and when you have a customer who may cause interruptions because they want to buy something themselves to avoid "markup" it can cause major delays. Many times a customer ends up getting the wrong material anyway. This again slows down a contractor that may already be too busy.

Everyone wants to save money, but when you start by questioning material costs or markups it can indicate that you may be under budgeting for the project, or will question every choice the contractor makes in the hopes of saving $100. Time is money and when you have a customer who may cause interruptions because they want to buy something themselves to avoid "markup" it can cause major delays. Many times a customer ends up getting the wrong material anyway. This again slows down a contractor that may already be too busy.


After the tearout, the plumbing and electrical are updated throughout the room to accommodate your new layout and fixtures. Then new backer board and subflooring 1 are put in, followed by tiling, and finally the installation of fixtures, lights, and accessories. From tearout to completion is usually a two to three week timeframe. Costs for this phase of the project range from $45-$65 for a plumber to $65-$85 an hour for an electrician and $5-$10 a square foot for flooring and tile preparation.

To give you more of an idea of what you'll pay before a contractor gives you an estimate, here are several cost examples for remodels of different size bathrooms, provided by Thumbtack Pro Viewpoint NW, a bathroom remodeler in Vancouver, Washington. Keep in mind each job was specific to that house. The total cost of each project includes all material and labor costs:


A typical bathroom remodel costs $5,000 to $15,000, with most homeowners spending $120 to $275 per square foot. A typical 5x7 bathroom remodel costs $4,200 to $9,600. Small renovations cost $2,000 to $5,000 and one-day bath or shower remodels from Rebath or Bath Planet run $4,000 to $10,000. Get free estimates from bathroom remodelers near you or view our cost guide below.
As a contractor I can tell you that most reputable contractors probably don't need your job, and if you make things too complicated or troublesome, they will move on to other jobs that don't throw up red flags. Much of what you ask for here is reasonable, but bringing a second contract into the equation can set of some alarms that you may be a difficult customer to work with or even a litigiously minded person who is likely to try and bring a lawsuit whether deserved or not. Anything you want covered should be in the original contract.

My bathroom is about 8X8. Received a quote for 17,000.00 just for labor only. Granted they would be gutting entire bathroom. Also plumbing fixtures will be in same place accept toilet moved 4"inches to the left. Air tub will replace current cast iron tub -no separate shower. My material cost will be about 9500.00 . They want half of the labor cost upfront ($8500.00 Demo will be done in one day and I must pay for dumpster. My home is worth about $200K This bathroom will cost a total of approximately $26K Is this a reasonable quote and I this too much overall to spend based on home resale?
As you might imagine, I once had to sue a contractor. He demanded payments up front during different stages of work replacing a roof and front porch on my house. When he wanted to cheap out and use inferior materials, i insisted he do the job to specifications I had provided to him in writing beforehand. He walked away from the job, half completed, and I had to hire someone else to finish it. I recovered most, but not all, of the money he had stolen.

I acted as general contractor and did all my own demo to remodel my 6x8 bathroom. I hired subs individually to do most of the work - an electrician, a plumber, a drywall guy and a tile guy. I painted the walls and the ceiling. I replaced everything except the cast iron tub. Materials and fixtures cost around $2000 and labor was about $3000. My subs had no problem with me supplying the materials, because I discussed their job scope in advance. This project took 6 months but I did have another full bath to use in the mean time.
I acted as general contractor and did all my own demo to remodel my 6x8 bathroom. I hired subs individually to do most of the work - an electrician, a plumber, a drywall guy and a tile guy. I painted the walls and the ceiling. I replaced everything except the cast iron tub. Materials and fixtures cost around $2000 and labor was about $3000. My subs had no problem with me supplying the materials, because I discussed their job scope in advance. This project took 6 months but I did have another full bath to use in the mean time.

We own a kitchen and bath company. If you are going to do the work yourself, you will save money....if you act as the GC, that is great as long as you have the time to manage the project. If you are using a guy out of his truck, the job will be less expensive. BUT check their references and insurance. WE run a legitimate business and a showroom. We are not inexpensive but are not high priced. YOU MUST have realistic expectations of what things cost, both in material and labor costs. We pull permits also....all this costs money. We have 30 years in business. Do not expect a full demo of a bathroom to be $11,000 in CT. If someone gives you a price like that RUN, it is too good to be true. You are looking at 18,000 and up. Cheaper does not mean better. If you are buying all the materials at HD or Lowes, good luck. You will redo your space one more time before you move. Spend a little more on a good, experienced contractor now....in the end it will be worth it.

I have a miserably small master bath with a particle board subfloor (house built 1969), so I must guy it. I bought toilet made for small bathrooms, and plan to pull the cabinet sink, replace with pedestal, raise storage like lighted bulkhead, demolish tile, and widen doorway from 28" to 32". I might gain 6" from tile removal alone, plus but another 6" on entrance with cabinet sink removal. Since large expense is in demolition, I could do that. But, install showers is tricky given the drain leveling so I'll hire a pro for that. Question: gutting, updating and repairing master bath is necessary, but to what extent should I go i, terms of resizing, which would entail bumping out wall into adjoining small room, which then adds expense of finishing that where window placement restricts encroachment. It's a nice older brick house that I bought before I realized the made of lapses and oversights by the home inspector (who also is a local top police official in a town with highly subjective law enforcement). I need to fix, list, well and leave. Any thoughts (and prayers much appreciated).
The average cost to gut and demolish a bathroom is $400 to $2,000. Prices depend on the room size, type of materials, which fixtures are being removed, if walls are being demolished, and if any damage is found in the subflooring or inner wall structure. You can DIY to save money, but hire a professional to inspect your electrical wiring and plumbing.
×