I can't even get anyone to look and give an estimate to complete a bathroom remodel- just the bathtub/shower part has to be done as the last person who was doing it died- the rest is complete and have all the items and materials already and paid for. once they hear that they are no longer intrested- what do they expect? me to let them rip out what was already done and repay and redone everything all over again so they get more money? and throw out brand new imported Travertine and Spanish tile?
As the home owner, I am providing about $8,000 in materials. This includes the cabinetry, fixtures, faucets, countertops, lighting, toilet, glass in-line shower door and tile. Received two quotes. One contractor wants $25,000 to demo the bathroom, convert the existing tub to a tiled walk-in shower, tile the floor, and install my materials. The other wants $27,000. Using the previously mentioned 60/40 labor to material rate, I would be paying more than double for labor...that's insane. Some contractor's need a reality check.

Any contractor or subcontractor who works on your house should be bonded, licensed, and insured properly according to state and local standards. Insurance can help protect you if your home gets damaged during construction or workers are hurt on site, while hiring a bonded contractor can help protect you if the contractor fails to pay workers, doesn't pay for permits, or doesn't finish the work. Here's more on how to do your research.


Using the ultra-trendy animal skull as a main focus point, this space definitely stands out from the rest of the usual white and boring contemporary bathrooms. Notice how the tiny, delicate bare branch echoes and contrasts the strong antlers on the wall, and how the pendant light hangs right in the middle of the negative space provided by the antlers.

We own a kitchen and bath company. If you are going to do the work yourself, you will save money....if you act as the GC, that is great as long as you have the time to manage the project. If you are using a guy out of his truck, the job will be less expensive. BUT check their references and insurance. WE run a legitimate business and a showroom. We are not inexpensive but are not high priced. YOU MUST have realistic expectations of what things cost, both in material and labor costs. We pull permits also....all this costs money. We have 30 years in business. Do not expect a full demo of a bathroom to be $11,000 in CT. If someone gives you a price like that RUN, it is too good to be true. You are looking at 18,000 and up. Cheaper does not mean better. If you are buying all the materials at HD or Lowes, good luck. You will redo your space one more time before you move. Spend a little more on a good, experienced contractor now....in the end it will be worth it.


A punitive approach to what could be unforseen and atypical delays may be a bad idea. I would suggest offering a bonus for the job being completed early rather than a penalty for it being delayed. If material is ordered, we can't make it arrive faster if something delays the shipment. We recently ordered a bathtub requested by a customer. It was promised by our supplier for a Wednesday delivery. Bad weather hit Texas and it just didn't leave the warehouse until the following Monday. It blew up our schedule for the project and it wasn't anyone's fault or mistake. If we have an employee critical to the project get sick or injured, we may not be able to get things done as originally scheduled. Jobs can get off schedule for a lot of reasons outside the contractor's control. Charging them for those things is likely to turn them away.

I acted as general contractor and did all my own demo to remodel my 6x8 bathroom. I hired subs individually to do most of the work - an electrician, a plumber, a drywall guy and a tile guy. I painted the walls and the ceiling. I replaced everything except the cast iron tub. Materials and fixtures cost around $2000 and labor was about $3000. My subs had no problem with me supplying the materials, because I discussed their job scope in advance. This project took 6 months but I did have another full bath to use in the mean time.


Going "green" is not only good for the environment; it’s also good for you. Green products have great design, tend to function better, which lowers utility bills, and they’re also chemical-free, making them better for your health. Having an eco-friendly approach to remodeling isn’t just about buying new products, doing something "green" can be as simple as painting a cabinet instead of tossing it in a landfill.
As you might imagine, I once had to sue a contractor. He demanded payments up front during different stages of work replacing a roof and front porch on my house. When he wanted to cheap out and use inferior materials, i insisted he do the job to specifications I had provided to him in writing beforehand. He walked away from the job, half completed, and I had to hire someone else to finish it. I recovered most, but not all, of the money he had stolen.
20% labor price ---out of the question----I'm a Building Contractor, If you are totally remodeling a bathroom, where is the cost for demo of existing???? Demo can easily run an extra 10%- factors: 1) Age of existing---many factors here to adjust price, 2) Accessibility ---Getting materials out of and to the bathroom, and protecting present surroundings of owner. 3) Cost to dispose of debris 4) Where is the Contractor's O & P ???
I acted as general contractor and did all my own demo to remodel my 6x8 bathroom. I hired subs individually to do most of the work - an electrician, a plumber, a drywall guy and a tile guy. I painted the walls and the ceiling. I replaced everything except the cast iron tub. Materials and fixtures cost around $2000 and labor was about $3000. My subs had no problem with me supplying the materials, because I discussed their job scope in advance. This project took 6 months but I did have another full bath to use in the mean time.
×