It's so competitive out there. I am a Long Island contractor and I be realized lately that clients give you an impression when you give them there costs that you are doing something wrong. I've been in this Busines about 20 years and that avg cost is right there. Also homeowners should also realize if us contractors are using subs for our plumbing and electrical our costs are hire than the guy doing all the work himself. I only used licensed contractors for all my remodeling work.
Having an onsite dumpster should be your responsibility if it is something you are going to demand. They aren't cheap. Make suggestions or request a dumpster be included in the bid, but I would never start demanding anything when requesting proposals. They may have their own suggestions. We own a dump trailer and we bring it during demolition to handle the large debris. We have the trailer to avoid having to rent a dumpster on the job. If asked we can share this information, but if you require a dumpster instead we would have to take the time and research getting a dumpster to your house and add in costs we aren't accustomed to adding. That takes time and effort we may just not want to expend to give you a quote. Good contractors are generally very busy.
As you might imagine, I once had to sue a contractor. He demanded payments up front during different stages of work replacing a roof and front porch on my house. When he wanted to cheap out and use inferior materials, i insisted he do the job to specifications I had provided to him in writing beforehand. He walked away from the job, half completed, and I had to hire someone else to finish it. I recovered most, but not all, of the money he had stolen.

The Home Depot is a great place to buy your bathroom essentials and remodeling materials. We also provide top-rated design and installation services for homeowners across America. Besides undergoing full background checks, our hand-selected remodeling experts are local, licensed and insured. The Home Depot also offers a great selection of flexible finance options.
My bathroom is about 8X8. Received a quote for 17,000.00 just for labor only. Granted they would be gutting entire bathroom. Also plumbing fixtures will be in same place accept toilet moved 4"inches to the left. Air tub will replace current cast iron tub -no separate shower. My material cost will be about 9500.00 . They want half of the labor cost upfront ($8500.00 Demo will be done in one day and I must pay for dumpster. My home is worth about $200K This bathroom will cost a total of approximately $26K Is this a reasonable quote and I this too much overall to spend based on home resale?
The cost to remodel a bathroom varies greatly. Factors like the current state of the space, the specific bathroom remodel design plans and material costs can all impact the overall price. Some bathroom remodel projects involve simple repairs and replacements in a small bathroom, whereas others require major replacements and upgrades, renovation of an entire bathroom or the addition of a whole new bathroom. So what will a bathroom remodeling contractor charge you? Let's look at the numbers.

The angles where any two planes meet in a wet area, such as the shower, tub, and countertop need to be filled with a flexible material to absorb movement and seal up this section to keep it watertight. This is usually done with some form of caulk 6, either latex or silicone. A tube of caulk 6 costs around $20 and this is usually installed with the tile, shower, or counter with the cost included in the tiling.


Often times, people confuse the difference between a master bathroom and a powder room. A master bathroom is a large bathroom that is attached to the master bedroom in a house. It is often big in size and contains a sink, toilet, shower, and bathtub. The bathtub and shower are either together or separate. A powder room is different in that it is a small bathroom only containing a toilet and a sink. Sometimes the name powder room is interchanged with guest bathroom or half baths. Powder rooms do not contain a shower, and is usually located on the first floor of a home. The purpose of a powder room is a bathroom for guests to use without feeling as if they are intruding into your home.

Don’t want your budget to skyrocket? Don't move your plumbing. On the surface, switching your sink and toilet around may look easy enough, but the problem lies underneath and all the costs involved in moving that plumbing. Besides, if you spend less money on moving fixtures, you’ll have more to spend on that new sleek shower system or vanity you’ve been eyeing.


My suggestion is when talking to contractor be subtle and ask your questions. Ask if he/she will have a dumpster or trailer to haul away debris. If the don't get dumpster or have a trailer then you probably don't want them to work on your home. Tell them your concern with the only toilet in the house. Unless it is not safe I have always reinstalled the toilet so it could be used at night. A good contractor will work with you in anyway possible because you are the key to more business.
Most bathroom remodels will include some degree of layout or planning. Small bathrooms can be planned by a contractor, but larger rooms should involve the work of a bathroom designer to help make the most of the space. This service typically costs between $1,400 and $4,000, and in some cases, the costs can be recouped during the renovation, as designers can help you save money in other areas. This phase of the project generally includes not only planning, but also drawings, and the selection of the materials that you want to go into the room. The time frame for this phase can last several weeks depending on layout and what you ultimately want the room to look like.
Home Stratosphere is an award-winning home and garden online publication that’s a result of our talented researchers and writers who work directly with hundreds of professional interior designers, furniture designers, landscape designers and architects from around the world to create helpful, informative, entertaining and inspiring articles and design galleries.
I just renovated a 6X12 bathroom. Old cast iron tub removed. Removed and saved existing vanity and vanity top. Removed the toilet and replaced the existing rotten flooring and added on to the existing partially rotten floor joist. Removed the drywall and tile from around the old tub. After the new flooring was in I had to modify the existing plumbing to accommodate the new tub and shower surround. The hot and cold water lines had to be raised to fit the surround because the new tub is taller and the drains had to be installed and moved to fit the new tub. Drywall was finished and painted. New faucets,New tub,Tub Surround, and flooring materials were purchased by the home owner. Labor cost was 4,584.00 
×